HVAC

HVAC

The conditions within a commercial workspace are a key component to an organization’s success. Every part of an HVAC system needs to work properly to avoid productivity and morale being jeopardized. We approach commercial air conditioning repair and service with the utmost care. To ensure optimal heating and cooling, we focus our effort on delivering safety, quality, and productivity – even coming through with emergency repair when needed. Our professional air conditioning system repair teams employ a specialized process that involves using local dispatching and confirmed service schedules. As your partner, we make routine follow-ups and issue quality assurance surveys to ensure you get the very best HVAC repair service.

Longmont United Hospital Medical Office Building Benefits from HVACR Retrofit

Longmont United Hospital Medical Office Building Benefits from HVACR Retrofit

Longmont United Hospital is a general medical and surgical hospital serving Boulder County, Colorado, and surrounding communities for over five decades. For the past several years, Longmont United Hospital has relied on Timberline Mechanical to provide expert HVACR repair and maintenance services for their main campus in central Longmont as well as their satellite location in Frederick, Colorado.

Read More >

Retrofitting a Biopharmaceutical Process Area

Retrofitting a Biopharmaceutical Process Area

Recently, Timberline was called upon to retrofit an existing biopharmaceutical process area to accommodate twice the amount of air it currently had available. The customer wanted to increase their production of product in this specific process area, and needed higher amounts of ventilation, as well as makeup air.

Read More >

Avery Brewery Company HVAC Design-Build & Engineering of Steam Plant and Chiller Water Plant

Avery Brewery Company HVAC Design-Build & Engineering of Steam Plant and Chiller Water Plant

Avery Brewing Company has been a client of Timberline Mechanical for a number of years. In September of 2013, they approached us with a dilemma; Avery was flourishing, and their building was becoming obsolete due to these “growing pains.”

Read More >

NIST Building 1 AHU Replacement

NIST Building 1 AHU Replacement

Wing 6 of Building 1 at the National Institute of Standards and Technology has mixing boxes throughout this wing of building 1. This wing of the building has tight temperature and relative humidity requirements.

Read More >

Movement Climbing and Fitness Split Systems

Movement Climbing and Fitness Split Systems

When we partnered with Movement Climbing and Fitness to build their new state of the art Climbing Facility in Denver, one aspect of the design was installing equipment that could provide great temperature control, high efficiency, and great filtration.

Read More >

Millenium Hotel Large Train RTU Replacement

Millenium Hotel Large Train RTU Replacement

The Millenium Hotel contacted our Service Retrofit team to replace a failing packaged Trane roof top unit. The Service Retrofit team was able to replace this 100 ton machine in an 8 hour day and have them up and running.

Read More >

Longmont United Hospital Joy Fan Motor and Blade Replacement

Longmont United Hospital Joy Fan Motor and Blade Replacement

The Timberline Service Team was contracted with to make repairs to the large joy fan that provides supply air to the hospital.

Read More >

Longmont United Hospital Boiler Replacement

Longmont United Hospital Boiler Replacement

Timberline Mechanical was contracted by Longmont United Hospital to replace three large standard-efficiency Weil McLane boilers and a large indirect water heater heated by the boilers.

Read More >

Lefthand Brewing Company Steam Boiler Install

Lefthand Brewing Company Steam Boiler Install

Timberline was contracted by Lefthand Brewing Company to do both the Steam and Chiller water design and install. The photo is the finished install of the Steam system install.

Read More >

Lefthand Brewing Company 140 ton Chiller Install

Lefthand Brewing Company 140 ton Chiller Install

Timberline was contracted by Lefthand Brewing Company to do both the Steam and Chiller water design and install. The photo is the finished install of the 140-ton chilled water system, including a set of direct coupled pumps to provide redundant operation and a buffer tank to help compensate for load changes.

Read More >

Exeter Building Large Aaon RTU Replacement

Exeter Building Large Aaon RTU Replacement

Our customer Transwestern Commercial contracted with Timberline Mechanical to replace 2 – 100 ton and 1 – 90 ton Mammoth packaged cooling only roof top units along with the equipment controls.

Read More >

Service Retrofit at the University of Colorado

Service Retrofit at the University of Colorado

We are working on a Service Retrofit project for the University of Colorado at the Bear Creek student housing in Boulder. We are replacing blower motors, blower wheels, isolation valves, control valves, and y strainers on over 200 HW/CW Fan Coil Units.

Read More >

Specialized Bicycles

Specialized Bicycles

In November 2022, our long-standing customer reached out to see if we would be interested in performing a Due Diligence for Specialized Bicycles. Specialized Bicycles was under contract to purchase a building in Louisville, Colorado and needed a pre-purchase Due Diligence to ensure they were getting a high-quality functional HVAC system and to help with price negotiations.

Read More >

329 Interlocken RTU Replacement Project

329 Interlocken RTU Replacement Project

We have developed a great long-term relationship with customer, EQT Exeter. We started at a small building in Louisville, CO performing a Due Diligence of the HVAC equipment and were then asked to survey two more buildings in the Interlocken area in Broomfield, CO.

Read More >